Lets hope it travels faster than this.http://www.birminghammail.co.uk/news/mid...-built-11352546
Great modern Technology, built by bone idle modern idiots. This should have been built much quicker than this
The email of the species is more deadly than the mail.
http://brummiestalking.org.uk/
Posts: | 43.994 |
Date registered | 12.22.2009 |
According to central news tonight that new line was due to open same time as central station last september ,but a spokes man said the problem was with the track this time ,it needs grinding a bit as it is a few millimetres out.
Posts: | 12.733 |
Date registered | 07.31.2013 |
Quote: Slow Jo wrote in post #2
According to central news tonight that new line was due to open same time as central station last september ,but a spokes man said the problem was with the track this time ,it needs grinding a bit as it is a few millimetres out.
The email of the species is more deadly than the mail.
http://brummiestalking.org.uk/
Posts: | 43.994 |
Date registered | 12.22.2009 |
I would think so ,usually with big contracts like that there are penalty clauses drawn into the contract when it is first drawn up.Would think by now it has cost the contractor's a packet.
Posts: | 12.733 |
Date registered | 07.31.2013 |
The email of the species is more deadly than the mail.
http://brummiestalking.org.uk/
Posts: | 43.994 |
Date registered | 12.22.2009 |
The email of the species is more deadly than the mail.
http://brummiestalking.org.uk/
Posts: | 43.994 |
Date registered | 12.22.2009 |
I know what you mean ,when I worked in the building trade ,one contractor dropped a big clanger ,he had to put it right at his own expense it finished him.
Posts: | 12.733 |
Date registered | 07.31.2013 |
Don't forget this is all new technology, there are bound to be problems.
Laying steel track in the road must be a terribly difficult job.
Just getting materials to site must take forever never mind getting access for the worker(s).
Perhaps Balfour Beatty are not doing so badly, the Dubai Tramway took ages to build but that was mostly due to lack of funds.
Dubai Tramway
They should all copy Lisbon where there is a massive tram system that climbs hills and goes all over the place.
In fact they finished so far ahead of schedule they managed to get hold of our trams, probably because we don't need them yet.
Lisbon Tram
Tram 28
The odd thing is that all the Birmingham trams in Lisbon look like they were made 100 years ago.
That's what I call forward planning.
The David Hey's Collection of Railway Photographs
Calendars for all years
British Movietone
Posts: | 18.439 |
Date registered | 02.24.2010 |
It won't run because it will be affected by leaves on the track, snow and any other excuse they can come up with. Whatever happened to great British engineering?
Posts: | 1.880 |
Date registered | 02.01.2014 |
Quote: Cleopatra wrote in post #10
It won't run because it will be affected by leaves on the track, snow and any other excuse they can come up with. Whatever happened to great British engineering?
The email of the species is more deadly than the mail.
http://brummiestalking.org.uk/
Posts: | 43.994 |
Date registered | 12.22.2009 |
The email of the species is more deadly than the mail.
http://brummiestalking.org.uk/
Posts: | 43.994 |
Date registered | 12.22.2009 |
Quote: Sheldonboy wrote in post #11
[quote=Cleopatra|p156128]It won't run because it will be affected by leaves on the track, snow and any other excuse they can come up with. Whatever happened to great British engineering?